N
The following projects should be completed by the supplier until January 31,
2018:
 Preliminary design
(Execution period)
The full, bankable design
(Execution period)
1 Full research part;
2
*Detailed construction project of the rehabilitation of administrative building
and on arrangement of the center of new discoveries;
3 *Project proposal/concept for the museum of the center of discoveries;
4 General Plan of the Territory;
5
* Project of arrangement of external and internal engineering
communications (water supply - sewerage, electric wiring, low voltage
systems, heating-ventilation, draining channels, drainage system, fire
protection system, infrastructure necessary for the movement of persons
with disabilities) of the project facilities;
6
• Detailed inclusive project for arrangement of infrastructure necessary for
the movement of persons with disabilities;
7 * Security system arrangement project
8 * The project of small architectural forms
9 Landscape design
10 The list of works to be performed and the cost estimate
11 The project of organization of works
12
* The project of dismantling of the existing small buildings - of the existing
small restaurant and two old metal structures;
13
The project of road cover arrangement (Including all communications and
drainage systems);
14
* The project of car parking arrangement (According to the research provided
in the concept, which refers to the number of visitors, it is necessary to
specify the number of cars with considering of the reserve account);
15
* The project of arrangement of overview platforms (near the administrative
building, the entrance road, the dam, the center of discoveries);
16
* The project of arrangement of information boards and marks on the project
area, as well as in Zugdidi and on the highway;
17 * The full detailed project of arrangement an external elevator on the dam;
18
* The project of landing with the Zipline rope (taking into account the
international norms of exploitation and security); 
The following projects should be completed by the supplier until
July 31, 2018:
19
The automation project, it is necessary to create a computer program for
managing of facilities;
20 * Project on the use of alternative energy sources;
21
* The detailed project of complete museum and multimedia means of the
center of discoveries and other facilities considered in the project;
22 * The project on the organization of electric bus tour;
23
* Detailed project of ropeway arrangement, including the small facilities of
ropeway stations and the modern media outlets in the cabins;
24
* The project of arrangement of water surf center on water reservoir;
25
* The project on arrangement of base-jumping / jumping with rope from the
dam;
26
* The project of arrangement of necessary infrastructure for traveling by
boat on the water reservoirs;
27 * The project for arranging infrastructure for paraplane flight;
28
* The project of arranging of prefabricated stage and tribune necessary for
the cultural events (also a project of infrastructure required for successful
projection, acoustics analysis);
29
* Infrastructure arrangement project necessary to organize virtual reality
experience space including media outlets;
30
* The project on using the existing gallery-tunnel space as a roller coaster,
according to the concept.